Capability — WCC Palau Construction Business in Palau

Williams Construction Company — Capability

Locally owned, trusted since 2011. Download the full company portfolio below.

📄 Download Full Company Portfolio (PDF, 19 pages)

Company Structure

Organizational roles:

No. Position Quantity Names
1 General Manager 1 Billy Takamine
2 Admin/Secretary 1 Josephine C. Salvador
3 Engineers 3 Engr. Jordan G. Malto (Civil)
Engr. Roxanne P. Beralas (Civil/Sanitary)
Engr. Jaymar Brigado (Electrical)
4 Accountant 1 Merry Victory Gyn S. Napil
5 Liaison Officer 1 Mary Basiou
6 Heavy Equipment Operator 3 Burt Maidesil, Rubin Kerai, Victor Pangilinan
7 Foreman 3 Luisito Velasco, Satur Antero, Rico Pondivida
8 Lead Carpenter 1 Juanilito Montejo
9 Carpenter-Mason 1 Rexson Querubin
10 Electrician 3 Sherwin Abriol, Irenio Alpar, Robert Ybanez
11 Plumber 1 Mohammad Kawsar
12 Carpenter General 1 Antonio Pesito
13 Mason 7 Marcial Rivera, Md. Khiron Sarkar, Nure Alam, Luisito Velasco Jr, Kawser, Mostafa Kamal, Md. Shariful Islam
14 Welder 1 Roger Pondivida
Total Personnel: 28

Our Team

Our team of 28 experienced professionals is led by:

Engr. Jordan G. Malto

Lead Civil Engineer

Leading our team of 28 experienced professionals with over a decade of civil engineering expertise.

Project Management & Quality

Project Manager

  • In charge of preparation of billings, DTR Weather Charts, permit requirements and all required communications for the project.
  • In charge of monitoring project expenses, requisitions of materials and equipments required for the projects.
  • Preparation of project schedules and plans and shall be directly supervising the supervisors and foreman assigned to the projects.
  • Ensure that all works shall be according to plans and specifications.
  • Coordinate with project owner on progress of the project.

Site Supervisors

  • In charge of requesting materials and equipments for assigned project.
  • Supervision of Site Foreman and manpower assigned to him.
  • Assist in field supervision and interpretation of plans and drawings.

Site Foreman

  • In charge of ordering materials, equipments, and tools in advance (at least 3 days before).
  • In charge of manpower distribution in his assigned project.
  • Ensure that the project is done on schedule.
  • In charge of securing materials, equipments, and tools at project site.
  • In charge of manpower safety at project site.

Safety, Environment & Sustainability

  1. All employees must wear hardhats on areas with treat of falling debris and other materials (e.g. in and out of the building site, etc).
  2. All employees are required to wear safety vest on jobsite that requires for their presence to be seen immediately (e.g. road, tunnels, etc).
  3. All employees are required to wear safety shoes at the jobsite at all times.
  4. Smoking must be done only on break time. And at least 10 feet away from jobsite or other employees that do not smoke (“Smoking is a choice, breathing is not”).
  5. No employee shall work if under the influence of alcohol and/or any drugs.
  6. All employees must have raincoats and rain boots ready at all times in case of unforeseen rain or storm.
  7. All Heavy Equipment will only be operated by a licensed Heavy Equipment Operator.
  8. Safety signage must be placed at the jobsite as precautions and to avoid accidents.

Environmental Management

Environmental safety procedures and requirements will be followed as stated on the issued permit and conditions of the Palau Environmental Quality Protection Board.

Sustainability Commitment

We, WILLIAMS CONSTRUCTION COMPANY (“WCC”) are glad to our part in the evolution of sustainable construction. Our company is committed to environmental responsibility by creating innovative projects in harmony with the environment and keeping up with the conditions set forth by the local government agency like Environmental Quality Protection Board (“EQPB”).

Palau is a pristine paradise. And with the ongoing development, we must consider sustainable options. WCC, as a locally owned construction company, we are with the government and its people as active participants in sustainability programs.

Featured Projects

Selected highlights from our portfolio. For a complete list of all 220+ projects, download the full portfolio (PDF).

The Development of Transmission Line Network

Year: 2024 • Value: $3.78M • Status: COMPLETED

Client: TOENEC CORP / AICHI

Supply and Installation of Water Lateral Lines in Koror

Year: 2018 • Value: $819,563

Aimeliik Mongami Road Project (multiple phases)

Value: total >$1M • Client: BPW / CIP

Design/Build of the Health Care Fund Building

Year: 2019 • Value: $400,976

US Department of Defense Projects

Year: 2021–2022 • Various projects

Koror State Government Road Concreting

Year: 2019 • Multiple works

Heavy Equipment Fleet

No. of Units Description Status/Condition
1 2024 Hyundai HD270 20-Ton Dump Truck Excellent Condition
2 2024 Shacman Dump Truck 40T Excellent Condition
2 10T Dump Truck Good Condition
1 2024 HOWO Tractor 40ft Extendable to 68ft Trailer 60T Excellent Condition
1 2014 Mitsubishi Fuso Fighter 8-Ton Excellent Condition
1 2005 Isuzu Forward Crane 6.7T Excellent Condition
1 Hyundai Super 8 -Ton Crane Truck Excellent Condition
1 1800 Gallon Water Truck Good Condition
1 Nissan Atlas 1997 Flatbed Truck (Liftback) P#17414 Good Condition
1 Nissan Atlas 2010 Flatbed Truck P#17460 Good Condition
1 Mazda Titan 2000 Flatbed Truck P#19193 Good Condition
1 Nissan Atlas 1998 Flatbed P#22010 Excellent Condition
1 Nissan Atlas 2004 Flatbed P#22009 Excellent Condition
1 308E Caterpillar Excavator Excellent Condition
1 315D Caterpillar Excavator Excellent Condition
1 311F Caterpillar Excavator Excellent Condition
3 Other Excavators Good Condition
1 0.5 – Ton Roller Good Condition
1 2.5 Ton BOMAG Roller 115 AC-3 Good Condition
1 10T CAT Roller Good Condition
1 5-Ton HELI Forklift CLGH50 Excellent Condition
1 2-Ton Forklift (LPG) Good Condition
1 Tractor Head Good Condition
1 Trailer 40ft Good Condition

Suppliers & Partners

Local Suppliers

  • Summit (Sunrise) Hardware
    Koror, Palau 96940
  • ACE Hardware
    P.O. Box 280, Koror, Palau
  • Mason's Hardware / Mason’s Rock
    P.O. Box 295, Koror, Palau
  • Palau National Quarry
    P.O. Box 37, Koror, Palau
  • True Value Palau (Neco Group)
    Koror, Palau
  • Globus Trading
    P.O. Box 10045, Koror
  • Lecor Construction Materials
    P.O. Box 401031, Koror

International Suppliers

  • AMERICAN INTERNATIONAL SUPPLY INC.
    Tamuning, Guam
  • LEED ELECTRIC & PLUMBING SUPPLY
    Barrigada, Guam
  • GRUNDFOS PUMPS (PHILIPPINES)
    Makati City, Philippines
  • FOCUSUN TECHNOLOGIES CO., LTD.
    Taoyuan County, Taiwan
  • GAIA TECHNOLOGY
    Taoyuan County, Taiwan
  • FAR EAST EQUIPMENT COMPANY LLC
    Tamuning, Guam
📄 Download Full Company Portfolio (PDF, 19 pages)